Evaluation-
in this project i have learnt how to use metering modes and what they do and how they affect the image. i have also learnt how different light effects how images look. i enjoyed this project because of what we got to photograph. If i was to do this project again i would improve the planning on my photoshoot because i had to redo my photoshoot because my image wasnt as good as i wanted them to be so i had to change my whole idea of my plan.
Thursday, 13 November 2014
risk assessment
Assessment Reference:
|
food
|
Activity Description:
|
|
Date:
|
4/11/2014
|
||
Student
|
Ashleigh peacock
|
Review Date:
|
|
Assessment Team Members:
|
|
Overall Potential Risk Factor:
|
2
|
Course Details:
|
ED Photography
|
|
|
|
|
Number of People Exposed:
|
1
|
|
|
Names of People Exposed:
|
1
|
Building-Place & Exact Location
|
14 markington place
|
Is This An Acceptable Risk?
|
|
Hazard
|
Persons At Risk and
How
|
Existing Control
Measures
What are
you currently doing to prevent it?
|
Probability
|
Severity
|
Risk Level
|
Additional Control
Measures
What else
do you need to do?
|
Probability
|
Severity
|
Risk Level
|
trip
|
Could
trip over the sheet on the floor
|
Make
sure that its flat and the ends are held down
|
2
|
2
|
3
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Assessment Conclusion
|
|
Subscribe to:
Posts (Atom)